BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
BEGIN:VEVENT
ORGANIZER;CN=ESTAD 2023:mailto:info@metec-estad.com
LOCATION:Room 15a
SUMMARY:Productivity improvement of large blast furnace (4554 m3) at Jindal Steel and Power Angul Odisha, India
DESCRIPTION:Jindal Steel and Power, Angul commissioned its first blast furnace of 4554 m3 in May 2017 at Odisha, India. This Blast Furnace has achieved productivity of 3.16 t/m3 of working volume/day by producing more than 12000 tons of hot metal in a day. Productivity improvement of large blast furnace is achieved by improving permeability inside the cylindrical structure of furnace by changing Sinter chemistry based on alumina percentage as higher alumina deteriorate the physical properties of Sinter, reducing fines and moisture input in terms of kg/thm, Modifying burden mix blending in main charging conveyor. This approach helped to increase oxygen enrichment with coal injection in the furnace to increase productivity.
CLASS:PUBLIC
DTSTART:20230614T121000
DTEND:20230614T123000
END:VEVENT
END:VCALENDAR
