BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
BEGIN:VEVENT
ORGANIZER;CN=ESTAD 2023:mailto:info@metec-estad.com
LOCATION:Room 13
SUMMARY:The fume treatment plant for an ironmaking or a steelmaking facility: Overview of the main factors that affect the design, for new and existing plants
DESCRIPTION:The Fume Treatment Plant sizing has to be highly customized. This is a common need both for the iron ore-route production (based on Blast Furnace or Direct Reduced Iron plants) and for the scrap route production (based on the Electric Arc Furnace). The steelmaking equipment characteristics and arrangement, the general site layout, the environmental local regulations and the Best AvailableTechnologies (BAT) for the pollution control have to be taken into account. The final choice implies always the comparison among different solutions regarding the fume capturing, the pollutants abatement devices, the possible energy saving, the cooling equipment and so on. The choices for FTP are also linked to the Water Treatment Plant. Often we are asked to improve the current situation with a revamping activity, where only part the existing plant needs to be modified to meet the increased production requirements or the more stringent environmental limits.
CLASS:PUBLIC
DTSTART:20230615T100000
DTEND:20230615T102000
END:VEVENT
END:VCALENDAR
